Воскресенье, 19 мая, 2024г.
russian english deutsch french spanish portuguese czech greek georgian chinese japanese korean indonesian turkish thai uzbek

пример: покупка автомобиля в Запорожье

 

SLS RS-25 Engine Test, 29 February 2024 (615 seconds test)

SLS RS-25 Engine Test, 29 February 2024 (615 seconds test)У вашего броузера проблема в совместимости с HTML5

An Aerojet Rocketdyne RS-25 rocket engine (RS-25 developmental engine E0525) was tested on the Fred Haise Test Stand (formerly A-1 Test Stand) at the John C. Stennis Space Center in Mississippi, on 29 February 2024, at 19:40 UTC (13:40 CST). This was the second test using a new production engine nozzle providing additional performance data on the upgraded unit and the eight hot fire test out of the 12 planned in the final round of certification testing ahead of production of an updated set of engines for NASA’s Space Launch System (SLS) that will be used beginning with Artemis V. The test had a planned duration of 615 seconds, with the RS-25 engine running up to 111% power level.
Credit: NASA

Мой аккаунт