У вашего броузера проблема в совместимости с HTML5
After many months of preparation, No 10 points at Orton Mere operate under their own power for the first time on 5/4/2014. Work still to be done includes lever locking and locking detection, and the associated crossover track circuits. The points worked and detected first time.